cyg contron co.,ltd.-尊龙官方平台

尊龙官方平台-凯时官网手机版下载/en
your current path: home > solutions > rail transit > rail transit

rail transit——gd4000 safety production management system for power supply operation of the whole line

system introduction

it is for misoperation prevention of electrical equipment throughout the rail transit line and covers main substations, traction stations, step-down stations, following stations, catenaries/main tracks, depots, parking lots and other areas. it realizes integrated anti-misoperation management of control in every link from the source”.

core value

the system adopts automatic control technology and arranges anti-misoperation blocking equipment and visualized grounding devices in each area to effectively prevent misoperation of electrical equipment and fundamentally eliminate potential safety hazards. it effectively improves the efficiency of earth wire connection/removal on the main tracks and depots and shortens the deployment time of safety measures.

the system can quickly and conveniently complete task generation, intelligent filling of operation tickets and work tickets, and task submission, review, saving and query management, and realize informatization management.

return list
links:
网站地图